Sadbhav Engineering logo

Sadbhav Engineering share news, announcements and annual reports

NSE: SADBHAVBSE: 532710Transport InfrastructureSmall Cap

Sadbhav Engineering Limited · Face value ₹1 · Listed Mar 2006
Last close ₹6.39down ₹0.33 (4.91%)BSE ₹6.45

Share price at the NSE close on 30 Oct 2026. Previous close ₹6.72.

30 Oct: open ₹6.72, high ₹6.72, low ₹6.35

52-week range of traded prices to 30 Oct 2026
₹5.90Low, 22 Oct 2026₹14.70High, 23 Dec 2025
Market cap
₹110 Cr2,619th largest listed
P/E
Earlier quarters restated in the year
P/B
Net worth zero or below
Dividend yield
Nonein the last 12 months
ROE
Assets held for saleon the latest balance sheet
ROCE
Assets held for saleon the latest balance sheet
Debt to equity
Assets held for saleon the latest balance sheet
Volume, NSE
1,12,56679.3% delivered

Sadbhav Engineering share news and announcements

963 announcements, routine notices left out, newest first. Page 18 of 20.

  1. Oct 2010

  2. Sep 2010

    • 23 Sep · Updates

      Sadbhav Infrastructure Project Limited (SIPL), a subsidiary of the Sadbhav Engineering Ltd., which had entered into a binding agreement to receive INR 400 crores from Norwest Venture Partners (NVP) and The Xander Group Inc- the Global Investors, has successfully completed the transaction. Accordingly the Investors have on September 23, 2010 invested an aggregate amount of Rs.400 crores in SIPL by subscribing to Equity and Compulsory Convertible Preference Shares.
  3. Aug 2010

    • 16 Aug · Updates

      The Company has been awarded the following project by Road Construction Department, Govt. of Jharkhand for accepted contract amount of Rs.229.91 crores in joint venture with GKC Projects Limited - Hyderabad. "Improvement / upgradation Strengthening/ Widening of Govindpur-Sahibganj State Road Project (Govindpur-Jamtara Contract Package No.1)". Company will lead the joint venture with 50% participation share
    • 5 Aug · Sale of Shares

      Mr. Girish N. Patel, Director and a member of the Promoter Group has sold 5,000 equity shares of the Company on July 29, 2010 at an average price of Rs. 1355.00 aggregating to 0.04% of the paid up capital of the Company. This intimation has been provided pursuant to the undertaking provided by the company to SEBI at the time of filing of the Draft Letter of Offer for the proposed rights issues of the Company.
    • 4 Aug · Corporate action

      The Rights Issue Committee of Board of directors of the Company in its meeting held on August 04, 2010 has approved the Final Letter of Offer to be issued to the members and shareholders of the Company. The Committee has also decided that the Rights would be open for subscription from August 18, 2010 and is scheduled to close on September 06, 2010
  4. Jul 2010

    • 20 Jul · Meeting

      At meeting of Board of Directors held on July 20, 2010 following has been decided/approved the following: (1) The Annual General Meeting of the Company will be held on September 08, 2010. (2) Register of Members and Share Transfer Books of the Company shall remain closed from August 23, 2010 to August 27, 2010 (both days inclusive) for determining the names of members eligible for dividend on Equity Shares, if declared at the Meeting.
    • 20 Jul · Board meeting

      To consider the Unaudited Financial Result for the quarter ended June 30, 2010 (Q1).
  5. Jun 2010

    • 8 Jun · Corporate action

      Rights Issue Committee of the Board of Directors of the Company ("Rights Issue Committee"), at its meeting held on June 07, 2010 have approved the terms of the proposed Rights Issue of Equity Shares along with Detachable warrants. The Rights Issue Committee at its meeting held on June 07, 2010, considered and decided that the Company would issue only one series of detachable warrants along with the new equity shares on the rights basis to its members and equity shareholders as on the record date. The details of the Rights Issue are as under: (1) Size of the Issue : Upto 4531.30 lakhs (excluding the value of detachable warrants as and when exercised). (2) Ratio : 1:20 (One Equity Share for every Twenty equity shares held as on Record Date.) (3) Price : Rs. 725/- per Equity Share (i.e. Rs. 10 towards face value and Rs. 715/- towards premium per Equity Share). (4) Amount payable on application : Entire issue price is payable on application. (5) Detachable Warrants and its entitlement : Three detachable warrants for every one equity share allotted in the issue. Each warrant will be converted into One Equity Share) (6) Conversion period of Detachable Warrant attached to the Rights Issue : The warrant exercise period shall commence after 3 months from the date of allotment of the Equity Shares in the Rights Issue upto 18 months from the date of allotment of the Equity Shares in the Issue. ("Warrant exercise period"). (7) Warrant Exercise Price for each Detachable Warrants : Rs. 425/- per Detachable Warrant (i.e. Rs. 10 towards face value and Rs. 415/- towards premium). (8) Treatment of Fractional Entitlements : For the Equity Shares with Detachable Warrants being offered on a right basis under the Issue, if the shareholding of any of the equity Shareholders is less than 20 (twenty) Equity Shares or not in multiple of 20 (twenty), the fractional entitlement of such Equity Shareholders shall be ignored. Equity Shareholders whose fractional entitlements are being ignored will be given preference in the allotment of one additional Equity Share each, if such Equity Shareholders have applied for additional Equity Shares with Detachable Warrant. Those Equity Shareholders holding less than 20 (twenty) Equity Shares and therefore entitled to Zero Equity Shares with Detachable Warrant under the Issue shall be dispatched the CAF with zero entitlement. Such Equity Shareholders cannot renounce their entitlement to apply for additional shares with Detachable Warrants in favour of any other person. A CAF with zero entitlement will be non-negotiable / non-renounceable.
  6. May 2010

    • 21 May · Dividend

      Board of Directors at its meeting held on May 21, 2010 has recommended a dividend of Rs.4 (Four) per equity share of company for the financial year 2009-2010.
    • 11 May · Board meeting

      To consider : (1) Audited Financial Result for the year ended on March 31, 2010; (2) To recommend the dividend on the equity shares of the company.
  7. Apr 2010

    • 26 Apr · Updates

      The Government of India has issued the Gazette notification prescribing the base toll rates for different category of vehicles using the Mumbai-Nasik (Vadape-Gonde) section from the Km chainage 539.500 to Km 440.000 of the National Highway No.3 in the State of Maharashtra, which consist of entire project length, being four laned by Mumbai Nasik Expressway Limited, the special purpose vehicle promoted by the Company to implement the Project
    • 19 Apr · Results

      The Company will submit its Audited Financial Result for the entire Financial Year 2009-2010 within 60 (Sixty Days) from end of the said Financial Year i.e. on or before May 30, 2010. In view of the above, company will not declare the un-audited results for the fourth quarter ended on 31/03/2010.
  8. Mar 2010

    • 25 Mar · Updates

      Company has achieved Financial Closure on March 23, 2010 in respect of its project "Design, Engineering, Construction, Development, Finance, Operation and Maintenance of 4 laning of Hyderabad - Yadgiri Section from km 18.600 to km 54.000 of NH-202 in the state of Andhra Pradesh under NHDP Phase-III on DBFOT (Toll) Basis (Package No. NHDP-III/BOT/AP/04)" through the Company's Special Purpose Vehicle i.e. Hyderabad Yadgiri Tollway Pvt. Ltd. The estimated cost of Project is Rs.480.22 Crores where in debt component is Rs.380.22 Crores and Balance of Rs.100.00 Crores is Equity.
  9. Feb 2010

    • 9 Feb · Updates

      The Consortium led by our Company has been awarded the project '4 laning of Bijapur - Hungund Section of NH-13 from km 102.000 to km 202.000 in the state of Karnataka on Design, Build, Finance, Operate and Transfer ("DBFOT"), Toll basis under NHDP Phase-III (Package No. NHDP-III/BOT/KNT/05)' from The General Manager (Tech), National Highways Authority of India (Ministry of Road Transport and Highways) G-5&6, Sector-10, Dwarka, New Delhi- 110075 in the name of Joint Venture known as 'SEL- MCL Consortium' in the ratio of 77:23 respectively. The proposed total cost of development of the said project stands at Rs.1225.00 Crores. The Concession Period of the project is 20 (twenty ) years including construction period of 910 (Nine Hundred and Ten) days from the 'Appointed Date'.
    • 8 Feb · Updates

      Company has been awarded the project/ work for contract price of Rs.136.83 crores from Northen Coalfields Limited ( a subsidiary of Coal India Limited). The details of the same shall be available on the NSE website (http://www.nseindia.com) under: Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements). For more details click here.
    • 3 Feb · Updates

      Company has achieved Financial Closure on February 03, 2010 in respect of project 'Modernization and computerization of integrated border check posts at 22(Twenty Two) locations in the State of Maharashtra on Build Operate and Transfer (BOT) Basis' through our Special Purpose Vehicle i.e. Maharastra Boarder Check Post Network Ltd. where in equity is held by Company, SREI Infrastructure Finance Limited and SREI Sahaj E-village Limited in ration of 90:5:5 respectively for their Project of Rs.1426.37 Crores where in debt component is Rs. 1141.10 Crores and Balance of Rs. 285.27 Crores is Equity
  10. Jan 2010

    • 21 Jan · Board meeting

      To consider the Unaudited Financial Results for the quarter and nine month period ended December 31, 2009.
    • 5 Jan · Updates

      Company has been awarded the project of "4 laning of Rohtak to Panipat Section of NH-71A from KM 0.000 (KM 63.30 of NH-10) to km 80.858 (Km 83.50 of NH-1) in the State of Haryana on BOT Basis under NHDP Phase-III." from The General Manager (Tech)- P&H. National Highways Authority of India (Ministry of Road Transport and Highways) G-5&6, Sector-10, Dwarka, New Delhi - 110075. The proposed total cost of development of the said projects stands at Rs.1350.00 (One Thousand Three Hundred Fifty) Crores. The Concession Period of the project is 25 (Twenty Five) years inclusive of construction period of 910 ( Nine Hundred Ten) days from Appointed Date
    • 4 Jan · Updates

      Company has been awarded the project " Design, Engineering, Construction, Development , Finance, Operation and Maintenance of 4 laning of Hydrabad-Yadgiri Section from km 18,600 to km 54,000 of NH-202 in the state of Andhra Pradesh under NHDP Phase-III on DBFOT (Toll) Basis (Package No. NHDP-III/BOT/AP/04)" from the General Manager (Tech), National Highways Authority of India (Ministry of Shipping, Road Transport and Highways) G-5&6, Sector - 10, Dwarka, New Delhi - 110075. Further, the proposed total cost of development of the said project stands at Rs. 490.00 (Four Hundred Ninety) Crores. The Concession Period of the project is 23 (Twenty Three) years inclusive of construction period of 650 (six Hundred Fifty) days from Appointed Date.
  11. Dec 2009

    • 18 Dec · Updates

      Company has achieved Financial Closure for its Project of Dhule Palesner Tollway Limited, a Special Purpose Vehicle for implementation of the project envisaging design, engineering, finance, construction, development, operation & maintenance of the 4 lane road from Km 168.500 ( MP/Maharashtra Border) to Km 265.000 (Dhule) of the Maharashtra Border-Dhule Section of National Highway No. 3 (NH-3) in the State of Maharashtra on Design, Build, Finance, Operate and Transfer (DBFOT) Basis where in equity is held by Hindustan Construction Company Limited and Sadbhav Engineering Limited for their Road Project of Rs.1420.00 Crores where in debt component is Rs. 1065.00 Crores and Balance of Rs. 355.00 Crores is Equity.
  12. Oct 2009

    • 14 Oct · Board meeting

      To consider the Unaudited Financial Results for the quarter September 30, 2009 (Q2) and half year ended September 30, 2009.
  13. Sep 2009

    • 29 Sep · Business

      Our Company has been awarded the following two Road Projects aggregating worth Rs. 477.00 crores by Jharkhand Road Projects Implementation Company Limited. (1) Improvement Works of Ranchi Ring Road (Section III Ch. km 0.600 to Ch. km 13.350 and Section IV Ch. km 0.000 to km 6.335) (19.085 Kms) in Jharkhand (Package ID: RRR-I) for accepted Bid Amount of Rs. 252.00 crores. (2) Improvement Works of Ranchi Ring Road (Section V Ch. km 0.000 to Ch. km 10.007 and Section VI Ch. km 0.000 to km 7.100) (17.107 Kms) in Jharkhand (Package ID: RRR-II) for accepted Bid Amount of Rs. 225.00 crores
    • 14 Sep · Updates

      Company has been awarded the following mining project/ work for contract price of Rs. 225.43 crores from Mahanadi Coalfields Limited (a subsidiary of Coal India Ltd). "Hiring of HEMM (Shovel, Drill, Dozer etc) for transport and transportation of materials in various Strata including drilling, excavation, dumping, spreading, dozing, and other allied works in specified areas for dumping as per the instructions of project officer/ Management of Lakhanpur project, Lakhanpur Area".
    • 7 Sep · Updates

      Pursuant to the Amended Memorandum of Understanding (MOU) entered by company in respect of the project 'Modernization and computerization of integrated border check posts at 22 (Twenty Two) locations in the State of Maharashtra on Build Operate and Transfer (BOT) Basis' the company has increased its stake to 90% from 51% in the said project. In terms of said MOU, Company and its consortium members shall have following equity participation in the said project. (1) Name of consortium member : Sadbhav Engineering Limited (SEL); Minimum Equity : 90%. (2) Name of consortium member : Srei Infrastructure Finance Limited (Srei); Minimum Equity : 5%. (3) Name of consortium member : Srei Sahaj e-village Limited (Sahaj); Minimum Equity : 5%
  14. Aug 2009

    • 3 Aug · Utilisation of Funds

      Vide notes to Accounts in the Un-Audited Financial Results for the quarter ended June 30, 2009 (taken on record by the Board of Directors of the Company at its meeting held on July 31, 2009) regarding the QIP fund has been fully utilized. The details of the same shall be available on the NSE website (http://www.nseindia.com) under: Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements). For more details click here.
    • 1 Aug · Meeting

      At meeting of Board of Directors held on July 31, 2009 following has been decided/approved: (1) The Annual General Meeting of the Company will be held on September 29, 2009. (2) Register of Members and Share Transfer Books of the Company shall remain closed from September 14, 2009 to September 29, 2009 (both days inclusive) for the purpose of Annual General Meeting and payment of dividend.
  15. Jul 2009

    • 27 Jul · Updates

      Aurangabad Jalna Toll Way Limited (AJTWL) subsidiary of company and a SPV incorporated in respect of the following project has achieved Commercial Operational Date (COD). "Providing four laning to Aurangabad-Jalna Road (MSH-6) km, 10/400 to 60/200 Beed bypass km 292/500 to 305/600 and Zalta Bypass km 0/00 to km 2/850 on BOT basis" Accordingly AJTWL has been authorized by Government of Maharashtra to collect the Toll from July 28, 2009
    • 23 Jul · Board meeting

      1) To consider the Unaudited Financial Result for the quarter ended June 30, 2009(Q1). 2) To decide about the date, time & place of Annual General Meeting. 3) To decide about the Book Closure for the purpose of dividend & AGM.
    • 21 Jul · Business

      The Company has been awarded the following project / work for contract price of Rs. 68.07 crores: Removal of all types of material in all kinds of strata by hiring of equipment such as HEMM, Tippers, Drills Dozers, Gradar and Water Sprinkler including its drilling, excavation, loading, transportation, dumping, spreading, dozing, grading and water sprinkling at specified places as per instruction of Engineer in-charge at Junad OCM of Wani North Area of Western Coalfield Limited (WCL)
  16. Jun 2009

    • 8 Jun · Utilisation of Funds

      Vide notes to Accounts in the Audited Financial Results for the year ended March 31, 2009 (taken on record by the Board of Directors of the Company at its meeting held on June 08, 2009) regarding the details of the utilization of QIP proceeds. The details of the same shall be available on the NSE website (http://www.nseindia.com) under: Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements). For more details click here.
    • 8 Jun · Updates

      Statement of Appropriation as per Clause 20 of Listing Agreement for the year ended March 31, 2009. A copy of the same shall be available on the NSE website (http://www.nseindia.com) under Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements). For more details click here.
    • 8 Jun · Dividend

      Board of Directors at their meeting held on June 08, 2009 has recommended a dividend Rs.4 (Four) per equity share of company for the financial year 2008-09.
  17. May 2009

    • 27 May · Board meeting

      To consider: (1) Audited Financial Result for the year ended on March 31, 2009. (2) To recommend the dividend on the equity shares of the company.
    • 5 May · Meeting

      Proceedings of the Extra Ordinary General Meeting of the Company held on April 29, 2009. A copy of the same shall be available on the NSE website (http://www.nseindia.com) under: Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements). For more details click here.
  18. Apr 2009

    • 29 Apr · Meeting

      Following resolutions were passed with the requisite majority at the Extra Ordinary General Meeting of the members of the Company held on April 29, 2009. (1) Ordinary Resolution pursuant to the provisions of Section 16, 94 and all other applicable provisions, if any, of the Companies Act, 1956 for increasing the Authorized Capital of the Company to Rs. 20.00 crores. (2) Special Resolution pursuant to the provisions of Section 81, 81 (1A) and all other applicable provisions, if any, of the Companies Act, 1956 for issuance of securities up to Rs. 125 crores to the existing shareholders of the company on Right Basis.
    • 28 Apr · Results

      Company will submit its Audited Financial Result for the entire Financial Year 2008-2009 within three months from end of the said Financial Year. Further, the Company will not declare the un audited results for the fourth quarter ended on March 31, 2009.
    • 6 Apr · Board meeting

      Board of Directors of the Company through a Resolution, passed by circulation approved the divestment of the Company's entire shareholding in its wholly owned subsidiary i.e. Sadbhav Natural Resources Private Limited. Hence, effective March 31, 2009, the said Company is no longer a wholly owned subsidiary of Sadbhav Engineering Limited.
    • 1 Apr · Meeting

      Notice of Extra-Ordinary General Meeting of the Company to be held on April 29, 2009. The copy of the same shall be available on the NSE website (http://www.nseindia.com) under: Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements). For more details click here.
  19. Mar 2009

    • 27 Mar · Rights/Others

      Board of Directors of the Company at the meeting held on March 27, 2009, approved the notice of the Extraordinary General Meeting to be held on April 29, 2009 and has taken the following decisions, subject to the approval of the shareholders: 1) To increase the authorized capital of the Company 2) To raise funds not exceeding Rs. 125 Crores by way of issue of equity shares / warrants or combination thereof or any other securities to the existing shareholders of the company on a Rights basis. The ratio, price and other terms of the proposed right issue would be decided at a later date, by the Board or committee thereof formed for the purpose.
    • 25 Mar · Board meeting

      To consider inter alia, the following business: (1) To issue Equity Shares/Warrants/any other securities on a rights basis to the existing shareholders of the Company pursuant to the SEBI (Disclosure and Investor Protection) Guidelines, 2000. (2) To approve the notice of the Extraordinary General Meeting to be convened for obtaining the consent of the shareholders for increase in the authorized share capital of the Company and the proposed rights issue.